Skip to content

Maybe if we specify mise 2.2.2? #166

Maybe if we specify mise 2.2.2?

Maybe if we specify mise 2.2.2? #166

Triggered via push May 16, 2025 17:48
Status Failure
Total duration 12s
Artifacts

test.yaml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

14 errors
test (ubuntu-latest, v0.10.4)
Process completed with exit code 1.
test (ubuntu-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_v0_10_4" failed
test (ubuntu-latest, nightly)
The operation was canceled.
test (ubuntu-latest, nightly)
The strategy configuration was canceled because "test.ubuntu-latest_v0_10_4" failed
test (macOS-latest, stable)
The operation was canceled.
test (macOS-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_v0_10_4" failed
test (macOS-latest, v0.9.5)
The operation was canceled.
test (macOS-latest, v0.9.5)
The strategy configuration was canceled because "test.ubuntu-latest_v0_10_4" failed
test (macOS-latest, v0.10.4)
The operation was canceled.
test (macOS-latest, v0.10.4)
The strategy configuration was canceled because "test.ubuntu-latest_v0_10_4" failed
test (macOS-latest, nightly)
The operation was canceled.
test (macOS-latest, nightly)
The strategy configuration was canceled because "test.ubuntu-latest_v0_10_4" failed
test (ubuntu-latest, v0.9.5)
The operation was canceled.
test (ubuntu-latest, v0.9.5)
The strategy configuration was canceled because "test.ubuntu-latest_v0_10_4" failed