Skip to content

chore(deps): bump actions/checkout from 4 to 5 #34

chore(deps): bump actions/checkout from 4 to 5

chore(deps): bump actions/checkout from 4 to 5 #34

Triggered via pull request September 1, 2025 06:48
Status Failure
Total duration 24s
Artifacts

lint.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (18.x)
Process completed with exit code 1.
build (20.x)
Process completed with exit code 1.
build (20.x)
The strategy configuration was canceled because "build._18_x" failed
build (22.x)
The operation was canceled.
build (22.x)
The strategy configuration was canceled because "build._18_x" failed